コントローラー Celec 98MDCのPDF マニュアルをオンラインで閲覧またはダウンロードできます。Celec 98MDC 9 ページ。 Mdi-controller

MDI-CONTROLLER
98MDC
RD
KW
DATE
MONTH
MD
KVA
TIME
HOURS
RD
KW
MD
KVA
98MDC
INSTALLATION GUIDELINES
1. Prepare the panel cutout with proper dimensions as shown in specifications.
2. Remove the clamp from the controller.
3. Push the controller into the panel cutout. Secure the controller in its place by pushing the clamp on the rear side. The screws, of the
panel of the clamp, must be in the furthest forward slot.
4. For proper sealing, tighten the screws evenly with required torque.
SAFETY SUMMARY
This manual is meant for the personnel involved in wiring, installation, operation and routine maintenance of the equipment.All safety related
codifications; symbols and instructions that appear in this operating manual or on the equipment must be strictly followed to ensure the
safety of the operating personnel as well as the instrument.
If the equipment is not handled in a manner specified by the manufacturer it might impair the protection provided by the equipment.
Caution:
1.
Read complete instructions prior to installation and operation of the unit.
1. The equipment shall not be installed in environmental conditions other than those specified in this manual.
2. Fuse protection-The equipment does not contain built-in-fuse. Installation of external fuse for electrical circuitry is highly
recommended. Recommended rating of such fuse shall be 275VAC/1A.
3. Since this is a built-in-type equipment (finds place in main control panel), its output terminals get connected to host equipment.
Such equipment shall also comply with basic EMI/EMC and safety requirements like BS EN 61326-1 and BS EN 61010
respectively.
4. The output terminals shall be strictly loaded to the manufacturer specified values/range.
METHOD OF MD CALCULATION
At the end of each fixed integrations Period average power for that period is calculated.
Assume a load pattern of the following type-
20KW
30KW
30KW
15 Mins
10:00
10:15 10:30
DEMAND CONTROLLER
R
Y
B
DATE
PROG.
AL-1
AL-2
TRIP
MINUTES
D
E
S
ATE
NTER
CROL
MENU
T
A
T
LARM
RIP
IME
-RESET-
Program before use
20KW
10:45
11:00
SPECIFICATION:
1. Voltage
2. Auxiliary Voltage
3. Current Path
4. Frequency
5. Display Size
6. Setting
a) Maximum Demand : Programmable 10 to 9000KW/KVA
b) Integration Time
c) Primary CT
d) Weekly Power Cut
e) Parameters
7. Programming Lock
8. Display Parameters
9. Output
10. Dimensions
11. Bezel/Panel Cut Out
12. Environment
Integration period is 30 minutes then
Demand (RD)- 10:00 to 10:30 block= (20*15+30*15)/30=25kW
Demand (RD) - 10:30 to 11:00 block= (30*15+20*15)/30=25kW
Demand
- at the end of 11:00 = 25kW
General
:
0 to 500VAC (Line to Line)
0 to 280VAC (Line to Neutral)
:
230VAC (+/-10%)
:
Secondary CT 5 Amp.
:
45Hz to 65Hz
:
0.56"
: Programmable 5 or 30 Minute
: Programmable Upto 9000Amp.
: Programmable weekly power cut
Time
:
:
Available
:
RD+MD, KW+KVA and Time+Date
: 3 Relays output 7 Amp. 230VAC
,
,
:
96mm (W) x 96mm (H) x 100mm (D)
: 90mm x 90mm
: Operation Temperature - 10 C to 60 C
Humidity Max 95% (Non Condensing)
o
o
1