- ページ 6
ゲートオープナー Automatic Solutions ASA244BSのPDF インストレーション&メンテナンス・マニュアルをオンラインで閲覧またはダウンロードできます。Automatic Solutions ASA244BS 14 ページ。 Industrial swing gate operator
Mark where the gate bracket is to be fixed onto the gate rail, ensuring both arms are in a horizontal and
level plane.
Fully open the gate and realign the gate bracket to the marked position to ensure there is adequate side
room for the arms to swing. If not, the last two steps may have to be repeated using a cut down
secondary arm.
Now attach the gate bracket to the gate rail with bolts suitable to handle the load and forces the gate
and operator will provide (normally 10mm).
E
C
LECTRICAL
ONNECTIONS
O
PERATORS
Connect 2 – 2.5mm
2
Connect 3 – 1.5mm
2
Connect shield to chassis (if over 10m runs).
C
C
ONNECTION TO
ONTROL
Supply
Connect a 10A 240v supply to din rail terminals labelled A & N. Connect earth to din rail terminal.
Motor Wires
Connect cable to din rail terminals labelled 'motor 1'.
Connect shield to earth terminal.
Control
Connect low voltage limit switch wires to limit switch terminals on circuit board. Note the common
terminal and open/close terminals for motor one and motor two.
Connect shield to earth terminal.
Control Inputs
The P.E, OPN and STP inputs require a normally closed switch contact and therefore should be shorted to
the COM terminal if not used. This is done via bridging links already on the circuit board (bottom left
corner) The CLS, OSC and PED inputs require a normally open switch contact and therefore should be left
unconnected if not used. All the switch inputs of this control board including the limit switch inputs require
a switch contact only. Do not connect any switches, which provide a voltage to the control board as this
will damage the control board. If the inputs are 12/24v or has long wiring associated with it use an IM-1
module to isolate it from the control board's input. The IM-1 is available from the manufacturer.
cables for the motor to the terminal strip provided.
cables for the limits to the terminal strip provided.
B
:-
OARD
6