- ページ 2

配管製品 Galvin Engineering Capstan 175.91.00.03のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Galvin Engineering Capstan 175.91.00.03 5 ページ。 Cp lead safe 1/2 turn wall top ass child safety tap

Product Installation Guidelines
Power drill
Spanner and hex key
Thread tape
PRE-INSTALLATION -
Note: Before installation, all lines must be flushed. Galvin Engineering recommends the installation of
strainers and pressure reducing valves to ensure clean consistent supply. Debris or poor water quality could
cause the push button to seize or fail to seal.
Wall body
Check that the existing valve body complies to AS/NZS 3718. Inwall body must be G5/8" FI and
body should be between 0 and 15mm behind the finished wall surface.
© Galvin Engineering Pty Ltd
MOUNTING DETAILS
Version 1, 7 July 2023, Page 2 of 5