Galvin Engineering Capstan 175.91.00.03 설치 매뉴얼 - 페이지 2
{카테고리_이름} Galvin Engineering Capstan 175.91.00.03에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering Capstan 175.91.00.03 5 페이지. Cp lead safe 1/2 turn wall top ass child safety tap
Product Installation Guidelines
−
Power drill
−
Spanner and hex key
−
Thread tape
PRE-INSTALLATION -
Note: Before installation, all lines must be flushed. Galvin Engineering recommends the installation of
strainers and pressure reducing valves to ensure clean consistent supply. Debris or poor water quality could
cause the push button to seize or fail to seal.
Wall body
Check that the existing valve body complies to AS/NZS 3718. Inwall body must be G5/8" FI and
−
body should be between 0 and 15mm behind the finished wall surface.
© Galvin Engineering Pty Ltd
MOUNTING DETAILS
Version 1, 7 July 2023, Page 2 of 5