- ページ 11

リフティングシステム AGT INDUSTRIAL AGT-B1000のPDF 製品マニュアルをオンラインで閲覧またはダウンロードできます。AGT INDUSTRIAL AGT-B1000 19 ページ。 Two-post auto lift

* * Important Information* *
7 Pressure Valve: Clockwise adjustment increases pressure to make the power unit to have
more power, counterclockwise adjustment decreases pressure to make the power unit to
have less power.
8 Hydraulic Fluid Flow Valve: Clockwise adjustment to speed up, counterclockwise
adjustment to slow down.

3.4 Load Test

Before testing, check anchor bolts to make sure they are completely tightened, and also
make sure 2 carriage on both sides are at the same level ( height difference should be less
than 10mm/0.39"). Adjust the cable nut on the shorter carriage to make sure 2 carriage
height at the same level and the 2 cables are similar tension.

4 - Operation and Use

4.1 Operation

Place the lifting arm at the support point specified by the vehicle and adjust the rubber tray to
the same height.
Check the position of the rubber tray under the vehicle chassis before each single raising or
when vehicle is lowered to the ground and need to raise again.

4.2 Raising/Lifting

Press the power switch until the vehicle reaches desired height. When the vehicle is raised,
the safety lock automatically engaged.
During raising/ lifting, check whether the arm lock has been locked, it can be visually checked
Fig 12 Power Unit Diagram
Page 11 of 19