- ページ 13
水ポンプ Bristan ST PUMP20TNのPDF 据付・操作・メンテナンス説明書をオンラインで閲覧またはダウンロードできます。Bristan ST PUMP20TN 20 ページ。 Standard 1.5/2.0 bar twin/single ended shower pump
5 COMMISSIONING
5.11 System Flushing: This pump incorporates push-in connectors
5.12 Water Supply: Always ensure that water storage capacity is adequate to meet
the demand. Ensure the pump chamber is full of water before starting the pump.
Failure to do this could result in seal damage. To ensure dry running does not
occur the pump must be primed as described in priming section below.
Do not run pump dry.
5.13 Priming: The pump must be primed (filled with water) before starting. With the
power turned off, turn on water supply from the system service valves, prime and
vent the pump by opening the pump inlet and outlet isolating valves to allow
pump to fill and vent. In the case of twin pumps, both pump chambers must be
independently primed.
5.14 Starting:
a) Open the outlet being pumped allowing the water to flow until all air has
been purged. The pump will be heard to run, turn the outlet off and the pump
will automatically stop.
b) Carefully check pump and pipework for leaks whilst pump is running and
stationary before leaving the installation unattended.
5.15 For Further Technical Support:
Contact Bristan Helpline on 0844 701 6273. Their staff are trained to help and
advise you over the phone.
and plastic components that must not come into contact with
solder flux, acid-based descalents or aggressive cleaning agents.
The pipework system should be flushed out prior to the pump
being connected to ensure any contaminants/chemical residues
and foreign bodies are removed from elsewhere in the system.
- 13 -
Cont ...