- ページ 5
室内暖炉 ADF ADH100IDのPDF 補足説明をオンラインで閲覧またはダウンロードできます。ADF ADH100ID 17 ページ。 Double sided inbuilt heater zero clearance box
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
Dimensions for Build out (side Elevation):
300mm
• Note the Clearance from the edge of the Flue Double casing is 70mm to
combustibles.
• 6mm cement sheet is required beneath the heater 550mm deep, and 300mm
in front of both Glass Doors.
• Clearance to combustibles in front of glass is 1200mm.
• Bottom vent must be 50mm from floor, 400x50mm (20,000mm2)
• Top vent must be 300mm below ceiling cap, 400x50mm (20,000mm2)
For any Mantle on front wall, must be to the 3.4.1.3(b) of AS/NZS 2918:2018
550mm
300mm
Vent 300mm below
cavity/ceiling cap.
Noggin 300mm above ZCB
MUST have 70mm
clearance from outer
Flue Casing to noggin /
combustible material.
Clearance of 1200mm in front
of glass to combustible
material.
Vent 50mm from the bottom
1/11/19
Fig. 4
5