ADF ADH100ID Instruções do suplemento - Página 5
Procurar online ou descarregar pdf Instruções do suplemento para Lareira de interior ADF ADH100ID. ADF ADH100ID 17 páginas. Double sided inbuilt heater zero clearance box
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
Dimensions for Build out (side Elevation):
300mm
• Note the Clearance from the edge of the Flue Double casing is 70mm to
combustibles.
• 6mm cement sheet is required beneath the heater 550mm deep, and 300mm
in front of both Glass Doors.
• Clearance to combustibles in front of glass is 1200mm.
• Bottom vent must be 50mm from floor, 400x50mm (20,000mm2)
• Top vent must be 300mm below ceiling cap, 400x50mm (20,000mm2)
For any Mantle on front wall, must be to the 3.4.1.3(b) of AS/NZS 2918:2018
550mm
300mm
Vent 300mm below
cavity/ceiling cap.
Noggin 300mm above ZCB
MUST have 70mm
clearance from outer
Flue Casing to noggin /
combustible material.
Clearance of 1200mm in front
of glass to combustible
material.
Vent 50mm from the bottom
1/11/19
Fig. 4
5