- ページ 12

試験装置 Major tech MT575のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Major tech MT575 16 ページ。 10kv high voltage insulation tester

4. Press the SEL button to select year, month, day, hour,
5. Press the ▲ "up button" or the ▼ "down button" till the
6. After all adjustments are complete, press the ENTER/SAVE
Note: if Date/Time unit (year, month, day, hour or minute)
7. Press the ESC/
7.1.4.2. Function 2 – Measurement time setting
1. Turn on the insulation tester by rotating the function rotary
2. Press the SEL function to enter the minor function selection.
3. Press the ▲ "up button" or the ▼ "down button to find the
4. Press the ENTER/SAVE button, LCD displays the picture
5. Press the ▲ "up button" or the ▼ "down button" to set the
6. After setting is complete, press the ENTER/ SAVE button to
Note: if Test Timer unit needs not to be adjusted, press the
ESC/backlight button and return back to the minor function
selection.
12
minute for adjustment, LCD displays the following picture
respectively;
correct value is reached.
button to confirm and save the data measured.
needs not to be adjusted, press the ESC/
return back to the minor function selection.
page.
(Test Timer)
switch to any position(except OFF).
measurement time setting; LCD displays the following
picture respectively;
shown in below:
test time (from 1-30 minutes)
confirm & save the data measured.
button again to return back to the main
to skip it and