Major tech MT575 사용 설명서 - 페이지 12

{카테고리_이름} Major tech MT575에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Major tech MT575 16 페이지. 10kv high voltage insulation tester

4. Press the SEL button to select year, month, day, hour,
5. Press the ▲ "up button" or the ▼ "down button" till the
6. After all adjustments are complete, press the ENTER/SAVE
Note: if Date/Time unit (year, month, day, hour or minute)
7. Press the ESC/
7.1.4.2. Function 2 – Measurement time setting
1. Turn on the insulation tester by rotating the function rotary
2. Press the SEL function to enter the minor function selection.
3. Press the ▲ "up button" or the ▼ "down button to find the
4. Press the ENTER/SAVE button, LCD displays the picture
5. Press the ▲ "up button" or the ▼ "down button" to set the
6. After setting is complete, press the ENTER/ SAVE button to
Note: if Test Timer unit needs not to be adjusted, press the
ESC/backlight button and return back to the minor function
selection.
12
minute for adjustment, LCD displays the following picture
respectively;
correct value is reached.
button to confirm and save the data measured.
needs not to be adjusted, press the ESC/
return back to the minor function selection.
page.
(Test Timer)
switch to any position(except OFF).
measurement time setting; LCD displays the following
picture respectively;
shown in below:
test time (from 1-30 minutes)
confirm & save the data measured.
button again to return back to the main
to skip it and