3.4 Electrical Connection

3.4.1 Connection to grid (AC side Connection)
(1) Check the grid voltage and frequency if it can comply with the required voltage and frequency of inverter connection.
(2) Add breaker or fuse to AC side, the specification should be more than 1.25 times of rated AC output current.
(3) The PE line of inverter should be connected to the earth, make sure the impedance of neutral wire and earth wire
less than 10 ohm.
(4) Disconnect the breaker or fuse between the inverter and the utility.
(5) Connect the inverter to the grid as follows:
Put the AC cable through the components in this order: screw cap, one-hole sealing ring, insulation body and sheet metal parts.
Installation method of NS Series 1-3KW please refer to Figure3.4.1-1.
Make sure the cable is connected well and can't be plugged out after connecting with AC terminals.
AC output board
M3X8 screw
05
Figure 3.3.2-5
Figure 3.3.2-7
AC connector
Screwdriver
The Insulator
Single hole seal ring
Screw cap
AC wire
Figure 3.4.1-1
There are two AC connector brands for NS 3.6kW~5kW & D-NS 3kW~5kW inverter, VACONN and WIELAND. Please refer to Figure
3.4.1-2.
VACONN Series
Installation instruction of VACONN series please refer to Figure 3.4.1-3.
10mm
fasten screw cap clockwise
Fastening three screws
to ensure each screw head
is not exceeding the surface
Installation instruction of WIELAND series please refer to Figure 3.4.1-4.
10mm
fasten screw cap clockwise
Fastening three screws
to ensure each screw head
is not exceeding the surface
Cable specification of NS 1kW~3kW AC side is showed as Figure 3.4.1-5.
B
A
A
C
D
Figure 3.4.1-5
WIELAND Series
Figure 3.4.1-2
fasten screw cap clockwise
Figure 3.4.1-3
Figure 3.4.1-4
Grade
Description
E
A
O.D
B
Conductor Material O.D
C
Wire Length
D
Bare Wire Length
E
Terminal
Value
Max 12mm
2.2~2.7mm
25mm
12mm
06