- ページ 8
農機具 Green Frog Designs Chicken LodgeのPDF 組み立て方をオンラインで閲覧またはダウンロードできます。Green Frog Designs Chicken Lodge 9 ページ。 Small
13
Fit the Nestbox Front Brace and the two Nestbox Side
Braces to the Nestbox Lid, which should have its
patterned side upwards, using Pi Clips.
15
Fit the Ramp under the door using the two Long Clevis
Pins and R-Clips. It will tilt to the ground under its own
weight.
17
MANUAL DOOR ONLY: Tie one end of the Cord to the
Split Ring in the Front Door and the other to the small
hole in the Door Handle. The Cord should pass through
the handle slot. Adjust the length of the cord so that,
when the door is fully raised, the handle just hooks onto
the edge of the opposite handhold or the roof edge.
Printed on recycled paper
14
The Nest Box Lid simply slides upwards so that the
cutouts fit into the recesses in the vertical panels. It is
secured with Linch Pins which can be tied to the End
Braces using 30cm of cord for each.
16
Fit the Roof using Linch Pins (Fix the centre first, then
bend it over the remaining lugs).
18
AUTOMATIC OPENER ONLY: Use four 3mm Screws,
Washers, and Nylock Nuts to secure the Chickenguard
automatic door opener to the holes provided.
Instructions for setting it up are provided with the opener
itself.
© green frog designs limited 2010
Page 8 of 9