- ページ 4
バスルーム設備 BERNSTEIN NT3311のPDF 組立説明書をオンラインで閲覧またはダウンロードできます。BERNSTEIN NT3311 12 ページ。 Freestanding tap
2. Recommended installation
4. Connect hot and cold water pipe
6. Installation test
Open the housing cover and
make sure that no water
escapes. After the pipes
are fully connected, apply a
water pressure of 0.5 - 1.2
MPa to both ends of the cold
and hot water pipes. Check
the connections carefully.
There should be no water
leaks in the piping, the test
time should not be less than
5 minutes.
8. Dispose of installation cap
4
3. Position
43 - 63mm
5. Spirit level
If the bubble is exactly in
the middle between the two
scale marks, the object is
optimally aligned.
43 - 63mm
7. Tiling
After the installation test, tile
the pipes according to the
instructions.
Tile installation Cut sizes:
Ø 102mm
9. Flush pipes
Use the S10 hexagonal key.
Remove the plugs and flush out any impurities.
Ø 102mm