- ページ 7
リフティングシステム Aqua Creek Products Power EZ 2のPDF マニュアルをオンラインで閲覧またはダウンロードできます。Aqua Creek Products Power EZ 2 16 ページ。 Pool lift and hard seat option
Aqua Creek Products Power EZ 2 にも: マニュアル (11 ページ), マニュアル (11 ページ), マニュアル (12 ページ)
STEP 5. Locate the chain assembly and insert the quick links
into the holes in the sling support bars (A).
Attach the hanger to the boom eye on the lift (B).
Adjust the chain links so that the sling is at the
appropriate height to allow the user easy access (C).
This may require several adjustments. Also, be
mindful of any obstacles such as coping or a gutter
that will need to be cleared.
STEP 6. Attach the handset controller plug at the base of
the control box. Press fi rmly until plug is fully seated in the
control box.
STEP 7. Slide the EZ turn bar into the attachment bracket.
If desired, the turn bar can be locked in place using the
1/4" button head, lock and fl at washer. Mount the FULLY
CHARGED 24V battery on top of the control box. When
properly mounted the battery will lock in place, causing a
'click' sound, and will sit fl ush and square with the control box.
ATTENTION! THE BATTERY MUST BE CHARGED FOR 24
HOURS BEFORE FIRST USE. STORE THE BATTERY ON THE
CHARGER AND NEVER LEAVE THE BATTERY ON THE LIFT
WHEN NOT IN USE.
Assembly is complete. Prior to lifting any persons, it is
recommended that the lift be operated 3-5 times without a
load for the lifts "break in" cycle period as well as to check for
proper functioning (and that the instructions for operating
the lift be read and incorporated into a training program for
the persons who will be operating the lift). For any person
operating the lift, please continue to operating instructions.
Read carefully for comprehension.
Copyright © 2021 Aqua Creek Products All Rights Reserved
Assembly Instructions
STEP 5
STEP 5
STEP 6
STEP 7
STEP 7
24V BATTERY
(CHARGED)
EZ TURN
BAR
Revised 5/28/21
B
C
A
7