- ページ 11

サーバー Dell Force10 S2410-01-10GE-24PのPDF マニュアルをオンラインで閲覧またはダウンロードできます。Dell Force10 S2410-01-10GE-24P 42 ページ。 Installing the s2410 system
Dell Force10 S2410-01-10GE-24P にも: アプリケーションノート (6 ページ), クイック・スタート・マニュアル (31 ページ)

Dell Force10 S2410-01-10GE-24P マニュアル

Site Preparation

This chapter describes requirements and site setup procedures for your S2410 system.
This chapter covers the following topics:

Site Selection

Cabinet Placement on page 11
Rack Mounting on page 12
Fans and Airflow on page 12
Power on page 12
Storing Components on page 12
Tools Required on page 13
For detailed S2410 specifications, refer to
NOTE: Install the S2410 into a rack or cabinet before installing any optional components.
Site Selection
Make sure that the area where you install your S2410 chassis meets the following safety requirements:
• Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes. Ideally, you connect each power supply to a separate circuit.
• Environmental temperature between 32° – 122°F (0° – 40°C).
• Relative humidity that does not exceed 90% non-condensing.
• In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
• Away from sources of severe electromagnetic noise.
• Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit
for proper ventilation, and access (see below).

Cabinet Placement

The cabinet must meet the following criteria:
• Minimum cabinet size and airflow are according to the EIA standard.
• Minimum of 5 inches (12.7 cm) between the side intake and exhaust vents and the cabinet wall.
Chapter , S2410 Specifications, on page
3
27.
Site Preparation
|
11