Dell Force10 S2410-01-10GE-24P Manual - Página 11
Procurar online ou descarregar pdf Manual para Servidor Dell Force10 S2410-01-10GE-24P. Dell Force10 S2410-01-10GE-24P 42 páginas. Installing the s2410 system
Também para Dell Force10 S2410-01-10GE-24P: Nota de aplicação (6 páginas), Manual de início rápido (31 páginas)
Site Preparation
This chapter describes requirements and site setup procedures for your S2410 system.
This chapter covers the following topics:
•
Site Selection
•
Cabinet Placement on page 11
•
Rack Mounting on page 12
•
Fans and Airflow on page 12
•
Power on page 12
•
Storing Components on page 12
•
Tools Required on page 13
For detailed S2410 specifications, refer to
NOTE: Install the S2410 into a rack or cabinet before installing any optional components.
Site Selection
Make sure that the area where you install your S2410 chassis meets the following safety requirements:
• Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes. Ideally, you connect each power supply to a separate circuit.
• Environmental temperature between 32° – 122°F (0° – 40°C).
• Relative humidity that does not exceed 90% non-condensing.
• In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
• Away from sources of severe electromagnetic noise.
• Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit
for proper ventilation, and access (see below).
Cabinet Placement
The cabinet must meet the following criteria:
• Minimum cabinet size and airflow are according to the EIA standard.
• Minimum of 5 inches (12.7 cm) between the side intake and exhaust vents and the cabinet wall.
Chapter , S2410 Specifications, on page
3
27.
Site Preparation
|
11