- ページ 21

産業機器 Siemens SIWAREX WL230 BB-S SAのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Siemens SIWAREX WL230 BB-S SA 44 ページ。 Base plate and elastomer bearing bb-s sa
Siemens SIWAREX WL230 BB-S SA にも: マニュアル (36 ページ), 取扱説明書 (48 ページ), 設備マニュアル (50 ページ)

Siemens SIWAREX WL230 BB-S SA 取扱説明書
4.2

Installing the base plate and elastomer bearing

4.2.1

General installation information

The installation conditions vary widely. The dead load of the load bearing implement can be
very low or relatively high. You might be dealing with a container, platform or a roller table. The
following installation instructions therefore only describe the general procedures.
To protect the load cells from damage during installation, always set up the load bearing
implement on dummies.
To place the elastomer bearings, lift the load carrier from bracket to bracket by only a few
millimeters. This section describes the assembly for this situation.
Note
Maintenance-friendly design
● When planning the layout, ensure that the load cells are easily accessible once they are
installed.
Depending on the installation conditions, the detailed procedure deviates from the following
description.
4.2.2

Overview

Overview
The following actions are required to install the elastomer bearing.
1. Preparing the load cell (Page 22)
2. Preparing the base plate and elastomer bearing (Page 22)
3. Mounting the elastomer bearing unit (Page 22)
4. Install the load cell with elastomer bearing unit (Page 23)
5. Set overload protection (Page 25)
6. Compensation of height with four or more support points (Page 25)
7. Checking the installation (Page 26)
8. Installing the grounding cable (Page 26)
The actions are described in detail in the following.
BB-S SA
Operating Instructions, 03/2020, A5E47358100-AA
4.2 Installing the base plate and elastomer bearing
Installation
21