- ページ 5
ネットワーク・ハードウェア Cisco ASR 5000のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Cisco ASR 5000 37 ページ。 Applying power and verifying the installation
Cisco ASR 5000 にも: インストレーション・マニュアル (18 ページ), インストレーション・マニュアル (33 ページ), インストール手順 (8 ページ)
Applying Power and Verifying the Installation
d) Repeat step a through step c for the second PFU.
Verifying the Installation
When power is applied to the chassis, power is provided to the upper and lower fan trays, and every installed
application and line card.
Each PFU, application card, and line card installed in the chassis has light emitting diodes (LEDs) that indicate
its status. This section describes how to interpret the LEDs to verify that all of the installed components are
functioning properly.
Important
Checking the LED on the PFU
Each PFU has a single status LED labeled POWER. This LED is green during normal operating conditions.
As the system progresses through its boot process, some cards may have no immediate LED activity. Line
cards have sporadic Link and Activity LED activity. It is recommended that you allow several minutes to
elapse prior to checking the LEDs on the various cards to verify the installation.
Verifying the Installation
ASR 5000 Installation Guide
5