- ページ 4

換気フード Whirlpool 24"のPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Whirlpool 24" 7 ページ。 Convertible range hood

terminal
. box
cover
Remove terminal box cover from
range hood.
Personal Injury Hazard
More than one person is required to help
with appliance
installation because of its
weight and size.
Failure to follow these instructions may
result in personal injury.
keyhole
slot
7
Lift the range hood into final
H position and center. Mark on the
underside of cabinet the location of the
four keyhole mounting slots. Set range hood
aside on a protected
surface.
I
i
i i
centerline
I
Determine and clearly mark a vertical
centerline on the wall and cabinet in the
area the vent opening will be made.
9.
To wire through top, mark a line 7- l/2" from
the right of the centerline on the underside
of the cabinet. Mark the point on this line
that is l-3/8" from back wall. Drill a l-l /4"
diameter hole through the cabinet at this
point.
To wire through rear, mark a line 7-l /2" from
the right of the centerline on the wall. Mark
the point on this line that is 64-5/a" from the
floor (or l-3/8" from underside of cabinet).
Drill a l-1/4" diameter hole through wall at
this point.
Numbers
correspond
to steps.
To vent through the roof with 7" round
ductwork, mark 4- l/2" and 5" in from back
wall along the centerline on underside of
cabinet. Use these points as centers to
draw 7- l/8" circles on underside of cabinet.
Use a saber saw to cut the openings for the
ductwork. Repeat for the underside of the
top of the cabinet. This will create slotted
openings.
To vent through the roof with 3- l/4" x 10"
rectangular
ductwork, mark a line 1" and 5"
from the back wall on the underside of the
cabinet. Mark lines 5 l/4" to the right and
left of the centerline on the underside of
cabinet that connect the lines just drawn.
Use a saber saw to cut a rectangular
opening for the ductwork. Repeat for the
underside of the top of the cabinet.
To vent through wall with 3- l/4" x 10"
rectangular
ductwork, measure from floor
65-7/a" and 62-3/a" (or l/8" and 3-5/a" down
from underside of cabinet) and mark on
back wall. Measure and mark a line 5- l/4"
to right and left of centerline, connecting
the two lines. Use a saber saw to cut a
rectangular
opening for the ductwork.
ii.
Install ductwork through the vent opening in
upper cabinet or wall. Complete venting
system according
to method needed. See
"Venting requirements. II Use caulking to
seal exterior wall or roof opening.
Attach rectangular
damper to selected
rectangular
vent opening. If damper is
attached
to back of range hood, be sure
damper hinge is toward the top. For round
vented installations, use round damper in
duct to prevent air from flowing back into
ductwork. If roof cap has a damper,
remove damper blade from range hood.
13.
Run wiring through wall or cabinets
according
to the National Electrical Code
and local codes and ordinances.
Do Not
turn on power until installation is complete.
keyhole
slot
14.
@
screw
Start screws through neck of each of the
four keyhole mounting screw slots on range
hood.
15.
Lift range hood into final position, feeding
electrical wire through wiring opening. Align
keyhole mounting screws slots with marks on
underside of cabinet. Tighten mounting
screws to cabinet, making sure mounting
screws are in narrow neck of slot.
Panel C