- ページ 5
リフティングシステム Direct-Lift Pro Cycle XLTのPDF 設置-安全-運用-メンテナンスをオンラインで閲覧またはダウンロードできます。Direct-Lift Pro Cycle XLT 12 ページ。 Motorcycle lift
lift.
Lift Lockout/Tagout Procedure
Purpose
injury to personnel by the operation of lifts in need of repair or being serviced. All employees shall
comply with this procedure.
Responsibility
The responsibility for assuring that this procedure is followed is binding upon all employees and
owner/manager. Each new or transferred employee along with visiting outside service personnel shall
be instructed by the owner/manager (or assigned designee) in the purpose and use of the lockout
procedure.
Preparation
5