Direct-Lift Pro Cycle XLT 설치-안전-운영-유지보수 - 페이지 5
{카테고리_이름} Direct-Lift Pro Cycle XLT에 대한 설치-안전-운영-유지보수을 온라인으로 검색하거나 PDF를 다운로드하세요. Direct-Lift Pro Cycle XLT 12 페이지. Motorcycle lift
lift.
Lift Lockout/Tagout Procedure
Purpose
injury to personnel by the operation of lifts in need of repair or being serviced. All employees shall
comply with this procedure.
Responsibility
The responsibility for assuring that this procedure is followed is binding upon all employees and
owner/manager. Each new or transferred employee along with visiting outside service personnel shall
be instructed by the owner/manager (or assigned designee) in the purpose and use of the lockout
procedure.
Preparation
5