- ページ 3
配管製品 Artos F703-9のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Artos F703-9 4 ページ。 Square slide rail with water outlet

( fig B )
1. Prepare rough in connection in the wall to accept wall connector so that
rear of escutcheon is against finished wall surface.
2. If rough in is prepared before wall finish thickness is known, set outlet at
least 2.5 " behind the cement board and use connector and nipple to
achieve correct positioning.
3. Thread water connection into plumbing prepared in the wall.
4. Install slide bar to finished wall.
5. Assemble hose and hand shower.
6. Turn on water supply and check for water tightness.
70340411
WALL CONNECTOR
INSTALLATION STEPS