Artos F703-9 Kurulum Kılavuzu - Sayfa 3
Sıhhi Tesisat Ürünleri Artos F703-9 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Artos F703-9 4 sayfaları. Square slide rail with water outlet
( fig B )
1. Prepare rough in connection in the wall to accept wall connector so that
rear of escutcheon is against finished wall surface.
2. If rough in is prepared before wall finish thickness is known, set outlet at
least 2.5 " behind the cement board and use connector and nipple to
achieve correct positioning.
3. Thread water connection into plumbing prepared in the wall.
4. Install slide bar to finished wall.
5. Assemble hose and hand shower.
6. Turn on water supply and check for water tightness.
70340411
WALL CONNECTOR
INSTALLATION STEPS