- ページ 7

ウォーター・ディスペンサー Fleck 5600 EconominderのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Fleck 5600 Econominder 11 ページ。
Fleck 5600 Econominder にも: オーナーズマニュアル (8 ページ), 取付説明書 (19 ページ)

Fleck 5600 Econominder インストレーション・マニュアル
3) Before filling the tank, place a piece of painter's
tape over the top of the riser tube to prevent
resin from dropping down inside as shown in
Figure 7-a. i avoid using duct tape which
leaves behind unwanted residue
3 › I n s ta l l I n G t H e F l e C k 5 6 0 0 Va lV e
Using caution not to lift the riser tube,
1)
remove the filling funnel and tape.
using the included silicone lubricant packet, lubri-
cate the inner and outer o-rings on the bottom of
the Fleck 5600 Meter Valve as shown in Figures
7-C and 7-D
Help: 888-426-5001
4) Place the included filling funnel over the top of
the tank as shown in
fill the tank. If your softener system came with
gravel
pour in the included resin media afterwards
F I G u R e 7- a
2) Next, install the t
mesh)
While
Valve as seen in Figure 7-E and then place the
valve onto the top of the tank, being sure that the
riser tube fits into the central o-ring on the valve,
as shown in Figure 7-F.
the tank.
on the valve or tank threading
s ta n d a R d
F I n e m e s H
F I G u R e 7- C
F I G u R e 7- d
QualityWaterForLess.com
Figure 7-B
, please pour this into the tank
op screen (standard or fine
to the bottom of the Fleck 5600 Meter
hand-tighten
do not use teflon tape or pipe dope
and prepare to
first
, then
F I G u R e 7- B
the valve to
F I G u R e 7- e
F I G u R e 7- F
PAGE 7