- ページ 6

ガス検知器 DOD Technologies ChemLogic CL8のPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。DOD Technologies ChemLogic CL8 7 ページ。 Continuous gas monitor

2.2 Tubing
NOTE : The two bundles of tubing labeled 'inlet' and 'out' each contain 8 tubes
which must be attached to the pyrolzers. The left pyrolyzer is points 1-4 and the
right side is points 5-8. The pyrolyzers are mounted opposite so the inlet and
out tubes are opposite each other on each unit.
First carefully attach inlet
tubes 1-4 to the top
connectors of the left
pyrolyzer.
Now repeat the procedure for
the inlet of points 5-8 on the
bottom of the right pyrolyzer.
Connect the outlet tubes for
points 1-4 to the bottom of the
left pyrolyzer.
Connect the outlet tubes for
points 5-8to the top of the
right pyrolyzer.
DC-ITD-CL4-CL8MANPYRO_A
REV 8/25/2022
Using the labels on the
tubing connect the inlet
tubes to points 1 thru 4.
Point 1 is in the top-left-
back sequentially thru point
4 in the top-left-front.. Fully
insert the tubes securely in
to the Pyrolyzer fitting.
Point 5 is in the bottom-
right-back sequentially
thru point 8 in the bottom-
right-front. Fully insert the
tubes securely in to the
pyrolyzer fitting.
Point 1 is in the
bottom-left-back
sequentially thru
point 4 in the
bottom-left-front.
Point 5 is in the top-
right-back
sequentially thru
point 8 in the top-
right-front.
6
CL4 & CL8 Manual
DODtec.com
815-788-5200