STEP 1
13
14
PARTS
INSTRUCTION
REAR BASE
POSITION REAR FLOOR '13' & FRT FLOOR '14'
- 13
AS SHOWN ENSURING HOLES ARE ALIGNED
FIT ALL SCREWS IN THE VERTICAL FACE.
FRONT BASE
- 14
POSITION FLOOR COVER STRIPS '23' AS SHOWN
FIT THE REMAINING SCREWS IN THE TOP FACE OF
FLOOR CVR CHNL
THE JOINT.
- 23 (X2)
(THE COVER STRIPS WILL ONLY FIT ONE
WAY, THEY BUTT TOGETHER IN THE CENTRE OF THE
FLOOR AND HIDE THE SCREW POINTS ALONG THE JOINT)
17*
STEP 5
9
PARTS
INSTRUCTION
LH REAR SIDE
REPEAT STEP 3 WITH LH REAR SIDE PANEL '9' ENSURING
- 9
THE CORNER JOINT IS CORRECTLY ALIGNED.
22*
STEP 2
8
PARTS
INSTRUCTION
RH BACK - 8
POSITION THE RH BACK '8' UP TO THE PRE
ASSEMBLED BASE ENSURING THAT IT SLOTS
INTO THE CENTRAL BASE CUT OUT AND THAT ALL
HOLES ARE ALIGNED, SCREW TOGETHER.
4*
STEP 6
SCREW INTO
THIS JOINT FIRST
12
11
SEAL FULL
LENGTH OF
THESE JOINTS.
PARTS
INSTRUCTION
PRIOR TO FITTING THE FRONT SIDES IT IS IMPORTANT
RH FRONT SIDE
- 12
TO RUN A BEAD OF SEALENT ALONG THE FULL LENGTH
OF THE VERTICAL JOINTS.
LH FRONT SIDE
POSITION RH FRONT SIDE '12' UP TO BASE AND RH REAR
- 11
SIDE AS SHOWN. FIX PANELS ALONG THE BASE JOINT AND
THROUGH THE REAR SIDE JOINT FIRST (SEE DETAIL) THIS
SIDE CVR CHNL
WILL ENABLE YOU TO THEN FIX THE SIDE COVER PLATE'22'
- 22 (X2)
AS INDICATED WITH THE REMAINING EIGHT SCREWS FOR
48*
THE JOINT
REPEAT THE ABOVE STEP WITH LH FRONT SIDE '11'
AND THE REMAING SIDE COVER CHANNEL '22'
STEP 3
10
PARTS
INSTRUCTION
RH REAR SIDE
LOCATE RH REAR SIDE PANEL '10' INTO THE BASE
-10
& RH BACK AS SHOWN ENSURING THAT THE CORNER
JOINT IS CORRECTLY ALIGNED ALONG WITH THE FIXING
HOLES.
SCREW TOGETHER ALONG THE BASE AND VERTICAL
JOINT.
22*
STEP 7
22
SCREW INTO
THIS FACE
LAST
15
PARTS
INSTRUCTION
RH FRONT PANEL
POSITION RH FRONT PANEL '16' ON TO BASE AND RH FRONT
- 16
SIDE AS SHOWN ALIGN HOLES AND SCREW TOGETHER.
LH FRONT PANEL
REPEAT ABOVE STEP WITH LH FRONT PANEL '15'
- 15
36*
STEP 4
7
PARTS
INSTRUCTION
LH BACK - 7
LOCATE LH BACK PANEL '7' INTO THE BASE & RH BACK
AS SHOWN ENSURING THAT IT ALSO SLOTS INTO THE
BASE CUTOUT AND THAT THE VERTICAL FOLDS ARE
CORRECTLY ALIGNED.
SCREW TOGETHER ALONG THE BASE AND VERTICAL
JOINT.
22*
STEP 8
16
PARTS
INSTRUCTION
FASCIA
ATTACH FASCIA PANEL '17' ACROSS THE FRONT OF
THE UNIT AS SHOWN, SCREW INTO THE LH & RH
- 17
FRONT PANELS.
10*
17