- ページ 5

計測機器 Akron 3578 STREAMMASTERのPDF 設置、操作、メンテナンスに関する説明書をオンラインで閲覧またはダウンロードできます。Akron 3578 STREAMMASTER 17 ページ。

C. MONITOR WIRING HARNESS ATTACHMENT
These instructions are to attach the monitor wiring harness to the logic box.
STEP 7
Remove the cable grip nut from the logic box for the wiring harness cable. DO NOT
REMOVE THE CABLE GRIP. Put the cable grip nut on the wiring harness cable with the
threads facing out. Put the cable through the correct logic box cable grip (see component
layout, Figure 5) so the cable grip nut will grab the outer cover of the cable. Tighten the
cable grip nut and attach the individual wires to the proper terminals (see wiring
schematic Figure 6).
D. BATTERY ATTACHMENT
The battery connections should be the last connection made.
STEP 8
AUXILIARY BATTERY - Remove the logic box cable grip nut for the auxiliary battery and
place it on the battery (#16-3) cable with the threads facing out. Thread the cable through
the cable grip nut until the cable grip will grab the cable. Tighten the cable grip and
attach the individual wires to the proper terminals (see wiring schematic Figure 6).
NOTE: Auxiliary Battery is not intended to operate the monitor.
STEP 9
VEHICLE BATTERY - Remove the logic box cable grip nut for the vehicle battery and
place it on the battery cable (#10-2 or #12-2 depending on length) with the threads facing
out. Thread the cable through the cable grip until the cable grip nut will grab the cable.
Tighten the cable grip nut and attach the individual wires to the proper terminals (see wiring
schematic Figure 6). Reattach the logic box cover and secure with the 6 screws.
NOTE: To supply enough current to operate the monitor properly, adequate wire size is critical.
OPERATING INSTRUCTIONS
A. CONTROLLER OPERATION
The controller is used to control the monitor and nozzle.
1. To deploy the monitor for use:
Lift the safety cover on the STOW/DEPLOY switch and push the toggle switch up and release.
Note: Some models may not be equipped with a deploy switch. The Deploy Function will only lower
the monitor. See DIP Switch 3 and 4.
2. To stow the monitor after use:
Lift the safety cover on the STOW/DEPLOY switch and push the toggle switch down and release.
Note: Some models may not be equipped with a deploy switch.
3. To change the horizontal monitor position toward the right or left:
Press the proper toggle switch toward "RIGHT" or "LEFT" respectively, as labeled on the controller,
until the desired position is reached.
4. To change the vertical monitor nozzle position upward or downward:
Press the proper toggle switch toward "RAISE" or "LOWER" respectively, as labeled on the controller,
until the desired position is reached.
5. To change the nozzle pattern toward the straight stream or fog position:
Press the proper toggle switch toward "STRAIGHT" or "FOG" respectively, as labeled on the
controller, until the desired nozzle position is reached.
THE LOWER CONTROL BOX FUNCTIONS WILL OVERRIDE THE UPPER CONTROL BOX
FUNCTIONS IN COMPLIANCE WITH THE REQUIREMENTS OF THE NFPA STANDARD. NOTE: THE
LOWER CONTROL AND UPPER CONTROL WIRES MUST BE ATTACHED TO THE CORRECT
TERMINALS FOR THE LOWER CONTROL (MASTER) TO OVERRIDE THE UPPER CONTROL
(SLAVE). NONE OF THE FUNCTIONS CAN BE CONTROLLED FROM THE UPPER CONTROL BOX
WHEN ANY OF THE SWITCHES ON THE LOWER CONTROL BOX ARE ACTIVATED.
Page 5