Step 6
Locate the cable holder and 4" sheave on the hardware
card. Wrap the cable around sheave and attach to the
clamp with a 1/2" x 2 1/2" bolt and nylock nut. Cable
holder is placed at approximately 120 degrees from
vertical clockwise (or at a 4:00 position) as shown in Fig.
6A. Now attach the cable end to the lower clamp with a
1/2" x 2 1/2" bolt and nylock nut as shown in Fig. 6A.
Torque both bolts to 80 ft/lbs.
Attach the other end of the cable by lifting the opposite
side of the front cradle and fastening with a 1/2" x 2 1/4"
bolt and nylock nut as shown in Fig. 6B. Torque to 80
ft/lbs.
Fasten the side cables to the lower frame clamps using
1/2" x 5" bolts, flatwashers, and nylock nuts as shown in
Fig. 6C. Check front corner posts for square. Torque to
80 ft/lbs.
The ball screw side cable is attached to the upper clamp
using a 1/2" x 2 1/4" bolt and nylock nut. See Fig. 6D.
The other side cable is attached to the upper clamp using
a 1/2" x 2 1/4" bolt and nylock nut as shown in Fig. 6E.
Torque both bolts to 80 ft/lbs.
1/2 x 5" Bolt, Flatwashers,
& w/ Nylock Nut
Cable
1/2" x 2 1/2" Bolt
Holder
Fig. 6A
w/ Nylock Nut
1/2 x 5" Bolt, Flatwashers,
& w/ Nylock Nut
1/2 x 2 1/4" Bolt
w/ Nylock Nut
Fig. 6B
Fig. 6D
Fig. 6A
Fig. 6D
Fig. 6C
SHEET 10 OF 12
Fig. 6E
Fig. 6B
Fig. 6C
1/2 x 2 1/4" Bolt
w/ Nylock Nut
1/2 x 2 1/4" Bolt
Fig. 6E
w/ Nylock Nut