Floe VSD6500 조립 지침 - 페이지 7
{카테고리_이름} Floe VSD6500에 대한 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Floe VSD6500 12 페이지. Full length pontoon & tri-toon bunks large lifts
Floe VSD6500에 대해서도 마찬가지입니다: 조립 지침 매뉴얼 (8 페이지), 조립 지침 매뉴얼 (16 페이지)
Step 3
Slide the two lower V-brace clamps
together. See Fig. 3A. Locate the
lower V-brace clamps approximately
in the center of the side frame beam.
Fasten the V-braces to the lower
V-brace clamps w/ (2) 3/8" x 3 1/2"
bolts and nylock nuts. See Fig. 3B.
Attach the diagonal V-braces to the
upper V-brace clamps using (2) 3/8"
x 3 3/4" bolts and nylock nuts as
shown in Fig. 3C.
At this time you may have to slide the
lower V-brace clamp horizontally
along the side frame beam to be
able to align the upper V-brace with
the holes in the corner posts. Once
aligned attach the upper V-braces
clamps to the corner posts using (2)
3/8" x 6" bolts and nylock nuts.
Male
V-brace
Clamp
Fig. 3A
Female
V-brace
Clamp
3/8" x 3 1/2 "
Bolts
Upper Clamp
Fig. 3C
3/8" Nylock Nuts
3/8" x 6"
Fig. 3B
SHEET 7 OF 12
Upper Clamp
V-Braces
Fig. 3B
Lower
Clamp
3/8" x 3 3/4" Bolt
3/8"Nylock Nut
Bolt
Fig. 3C