Aktakom AMM-1081 운영 매뉴얼 - 페이지 11

{카테고리_이름} Aktakom AMM-1081에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aktakom AMM-1081 20 페이지. Smart multimeter

4-2 Power supply from the battery
1)
Install the " DC3V battery ( CR-2032 ) x 2 PCs "
into the " Battery compartment " ( 3-14, Fig. 1)
2)
Slide the " Power type switch " to the " B " position (
battery position ), the meter will offer the power
source from the battery.

5. MEASURING PROCEDURE

5-1 precautions & preparations for measurement
5-2 Power management
1)Pressing the " Power On button " ( 3-2, Fig. 1 ) once,
the meter will be power On.
2)The meter will be power Off automatically within
3 minutes after power On.
1) Place the Red & Black Test Leads into
the proper input terminal before
making measurement.
2) Remove either of the test leads from
the circuit when changing the
measurement range.
3) Do not exceed the maximum rated voltage
and current to the input terminal.
4) For safety consideration, when change
the new test leads, it should use the
replace approval test leads.
8
www.tmatlantic.com