Aktakom ASE-4509 사용자 설명서 - 페이지 3
{카테고리_이름} Aktakom ASE-4509에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Aktakom ASE-4509 8 페이지. Smd rework station
2. Operating Instructions
2.1 Before Operation
• Select the appropriate FP Pick-up Wire that
matches the size of the IC. The Fp Pick-up has an S
wire (14mm) attached to it, an L wire (30mm) may
also be needed, depending on the size of the IC.
• Select the appropriate Nozzle that matches the
size of the IC.
• Loosen the screw on the nozzle , insert the Nozzle
into the top, then fasten the screw properly.
2.2 The display and temperature setting
1. Press the button "+" or "-"to adjust the
temperature. In short press, the set-point will change
±1°C In long press, the set-point will change quickly
and reach your target temperature.
2."* " is the transfer button between °C/°F. The
default unit is °C, press the "* "button to make change
between °C and °F.
3
www.tmatlantic.com