14POINT7 SLC DIY 2 조립 설명서 - 페이지 5
{카테고리_이름} 14POINT7 SLC DIY 2에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 14POINT7 SLC DIY 2 7 페이지.
Power Cable Construction
Required parts:
•
4 conductor cable
•
4 position molex connector
•
4x molex contacts
4
3
2
1
Trim 2 inches off the sheath of the 4 conductor cable, crimp/solder the lambda contacts to the cable, insert the contacts
into the 4 position molex connector. Use the color code according to the above diagram.
Auxiliary 1 Cable Construction
Required parts:
•
8 conductor cable
•
8 position molex connector
•
8x molex contacts
8
7
6
5
4
3
2
1
Trim 2 inches off the sheath of the 8 conductor cable, crimp/solder the lambda contacts to the cable, insert the contacts
into the 8 position molex connector. Use the color code according to the above diagram.
P a g e
| 5