Da-Lite Contour Electrol 지침서 - 페이지 4
{카테고리_이름} Da-Lite Contour Electrol에 대한 지침서을 온라인으로 검색하거나 PDF를 다운로드하세요. Da-Lite Contour Electrol 13 페이지. Installer friendly features
Da-Lite Contour Electrol에 대해서도 마찬가지입니다: 지침서 (9 페이지), 설치 관리자 매뉴얼 (2 페이지), 지침서 (4 페이지), 지침서 (8 페이지), 지침서 (8 페이지)
ELECTRICAL INSTALLATION
1. open the junction box on the left end of the case using a #2
Phillips screwdriver. Install electrical connections that apply
to your unit. Make sure to review the wiring diagram for
proper hook up. Replace the junction box cover.
NoTe: Must be installed in accordance with the
requirements of the Local Building Codes, the Canadian
electrical Code (CeC), CAN/CSA C22.1 and the National
electric Code (NeC), NFPA 70.
2. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor,
the standard duty cycle is 1 minute on and 3 minutes off.
4
Junction
Box Cover
Figure 5