DoorHan SHAFT-30 설치 및 운영 매뉴얼 - 페이지 5
{카테고리_이름} DoorHan SHAFT-30에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorHan SHAFT-30 12 페이지. Ip65/60 ip65
DoorHan SHAFT-30에 대해서도 마찬가지입니다: 설치 매뉴얼 (8 페이지), 매뉴얼 (12 페이지)
3. OPERATOR UNIT
4. OPERATOR INSTALLATION
4.1. TOOLS
1
2
1.
Set of spanners
2.
Set of slotted and cross screwdrivers
5
6
3.
Set of drills for metal
Make sure, that the door is in good working condition and the torsion springs balance the door leaf before installation. Install
the operator as described below (see par. 4.2 or 4.3).
4.2. ON-SHAFT INSTALLATION
•
Install mounting bracket on the wall using
screws. The mounting bracket can be installed
from the left or from the right of the operator.
•
Turn the release lever 180 degrees counter-
clockwise.
•
Install the first closing ring on the door shaft.
•
Install the operator on the door shaft (make
sure, that the bushing key is in proper position)
and screw it to the mounting basis.
•
Install the second closing ring on the door
shaft and push it close to the operator.
•
Install the first closing ring close to the operator
and fix both closing rings.
1
1
3
4
5
5
4.
Set of drills for concrete
5.
Pliers
7
8
6.
Hacksaw for metal
Closing rings
135
1.
Reducer casing
2.
Output shaft
3.
Motor
1
1
2
2
2
2
4.
Hand chain components
5.
Hand chain
5
5
6
6
6
6
7
7.
Electric drill
8.
Tape measure (folding rule)
Fastening
bracket
OPERATOR UNIT
100
352,5
6.
Cable
7.
Wiring terminal block
8.
Release handle
3
3
3
4
3
4
4
9.
Limit switch
7
7
7
8
8
8
Bearing
bracket
5
4
8