Astrapool Dual Pure 100 매뉴얼 - 페이지 3

{카테고리_이름} Astrapool Dual Pure 100에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Astrapool Dual Pure 100 20 페이지. Salt electrolysis and ph regulation

INSTALLATION IN THE TECHNICAL AREA

Electronic unit:
-
Fix the support for the unit onto a wall using the provided screws and fasteners. If possible,
this should be close to the filtration unit to facilitate electrical connection and be protected
from water spray and condensation.
Important: ensure that the controls for the unit are accessible. To prime the pH pump correctly, it is
important that the height between the suction line and the pH pump head do not exceed 2 metres.
-
Attach the wall support, respecting the edges below (in mm). They indicate the compulsory
minimum spacing between the support and other elements on the wall.
NB: screws and fasteners to fix the device are provided. Holes of a diameter of 8mm should be made.
-
Place the device on the support.
Verify the correct positioning of the non-return clip
3
Número de revisión
ENGLISH
Rev 001-2013-08-06