AIR GAP TAP-A-FLOW AG250-303 설치 절차 - 페이지 2
{카테고리_이름} AIR GAP TAP-A-FLOW AG250-303에 대한 설치 절차을 온라인으로 검색하거나 PDF를 다운로드하세요. AIR GAP TAP-A-FLOW AG250-303 2 페이지. Floor pedal, stainless steel finish
1 – Floor pedal
2 – #6x1 mounting screws
2 – 1"x3" Double sided adhesive pads
The AG250-303, in combination with
AG250-002 valve, provides hands-free
faucet operation. Valve is ordered
separately.
Please read the instructions once through before starting.
PEDAL INSTALLATION INSTRUCTIONS
1.
Pass cable from the AG250-002 valve
through an opening under the cabinet plate and
connect it to the pedal AG250-303.
2.
Unscrew the front nut (1) on the valve cable and insert the
cable (4) through the slot on the back side of AG250-303
pedal. The rear nut (3) remains at the end of the thread (2).
Adjust cable holder (2) for proper pedal operation and
secure its position with nuts (1) and (3). Use 3/32 wrench
for tightening nuts(M5x0.8mm).Control cable (4) should be
snug. (FIG.1)
2
1
FIG. 1
AG250-303
Installation Procedures
LIST OF PARTS ENCLOSED
4
3
-OVER-
AG250-002
Cold/Hot Potable Water
Mechanical Valve
Verify that valve actuating cable is inside the
valve receptacle( FIG.2)
FIG. 2
Insert valve cable end T-bar (5) into the pedal
lever (6) (FIG.3)
6
FIG. 3
5