Bolton Tools HP-L4G 설치, 운영 및 유지보수 매뉴얼 - 페이지 8
{카테고리_이름} Bolton Tools HP-L4G에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Bolton Tools HP-L4G 16 페이지. Two-post model autolift
Prior to operation of lift recheck equalizer cables making sure they are not
crossed or routed improperly. Be sure the cables have remained in place
over the pulleys.
P
H
OWER UNIT &
Mount Power Unit to power column as shown in Fig 6 The mounting hardware, M8 hex nuts, are pre-
18.
installed on power unit mounting bracket.
IMPORTANT – To insure proper hose fitting seal without damage to the fitting follow this
19.
procedure for each hose connection: Screw flared fitting on finger tight. Rotate flared fitting 1 1/2 hex
flats (90 deg.). Back the flared fitting off one full turn. Again tighten flared fitting finger tight, then
rotate flared fitting 1 1/2 hex flats (90 deg).
Thread power unit hydraulic hose into elbow on power unit. Route hydraulic hose from Idler column
20.
across floor plate ass'y to the Power Column.(Fig 6)
Once the Power Unit is secured, fill reservoir with #10 weight HYDRAULIC OIL ONLY. Care
21.
Fig 4- Cable Routing
Fig 5- Attaching Cable
YDRAULIC HOSE
6