Baumer Hubner Berlin PMG10 운영 매뉴얼 - 페이지 28

{카테고리_이름} Baumer Hubner Berlin PMG10에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Baumer Hubner Berlin PMG10 44 페이지. Absolute encoder
Baumer Hubner Berlin PMG10에 대해서도 마찬가지입니다: 설치 및 작동 지침 (32 페이지), 설치 및 작동 지침 (32 페이지)

Baumer Hubner Berlin PMG10 운영 매뉴얼
6
|
Electrical installation
1
EMV ring
3
Second flange connector
5
Code
7
Supply cable (ø7-12 mm)
Tools
24 mm
n
n
Crimping or soldering tool (depending on connector)
n
Instruction:
a) Push cable through inside the housing and insulate.
b) Open the shield and place it around.
c) Insulate each individual strand.
d) Crimp or solder the contacts.
e) Snap in the contacts and lock the insulating body.
f) Place the shield around and cut in shape where necessary.
g) Push the plugin insert into the housing, mind the encoding groove.
h) Close and tighten.
28
1
2
27 mm
7
27 mm
Operating Manual
5
24 mm
6
2
Cable shield
4
First flange connector
6
Round connector M23
Baumer Hübner
3
4
PMG10 & PMG10P SSI | V1