Baumer Hubner Berlin PMG10 Bedieningshandleiding - Pagina 28

Blader online of download pdf Bedieningshandleiding voor {categorie_naam} Baumer Hubner Berlin PMG10. Baumer Hubner Berlin PMG10 44 pagina's. Absolute encoder
Ook voor Baumer Hubner Berlin PMG10: Montage- en bedieningsinstructies (32 pagina's), Montage- en bedieningsinstructies (32 pagina's)

Baumer Hubner Berlin PMG10 Bedieningshandleiding
6
|
Electrical installation
1
EMV ring
3
Second flange connector
5
Code
7
Supply cable (ø7-12 mm)
Tools
24 mm
n
n
Crimping or soldering tool (depending on connector)
n
Instruction:
a) Push cable through inside the housing and insulate.
b) Open the shield and place it around.
c) Insulate each individual strand.
d) Crimp or solder the contacts.
e) Snap in the contacts and lock the insulating body.
f) Place the shield around and cut in shape where necessary.
g) Push the plugin insert into the housing, mind the encoding groove.
h) Close and tighten.
28
1
2
27 mm
7
27 mm
Operating Manual
5
24 mm
6
2
Cable shield
4
First flange connector
6
Round connector M23
Baumer Hübner
3
4
PMG10 & PMG10P SSI | V1