Dover Liquip Swift 드라이버 매뉴얼 - 페이지 4

{카테고리_이름} Dover Liquip Swift에 대한 드라이버 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dover Liquip Swift 10 페이지. Delivery system

Dover Liquip Swift 드라이버 매뉴얼
Batch Gravity (Preset Partial Delivery)
TIP: Ensure there is appropriate space for delivered product in tank prior to and during delivery.
Press "MENU" button twice to get to the Batch Selection screen (refer to Figure 1.4, page 2).
1.
Input quantity to be delivered using the "ARROW" buttons.
2.
Confirm amount by selecting the "OK" button.
3.
Press "MENU" button to return to the DFV-Swift Home screen (refer to Figure 1.1, page 2).
4.
Connect delivery hose to the API and connect the product delivery elbow, as required.
5.
Select "GRAV" on DFV-Swift home screen (refer to Figure 1.1, page 2).
6.
Wait for the DFV request and then open foot valves by pushing down of the "FOOT VALVES" button on the
7.
Swift-Mx Box.
Physically, open the API valve and then product is dispensed (refer to Figure 1.2, page 2 for delivery
8.
diagnostics).
Monitor delivery as required.
9.
NOTICE: The flow will stop once preset quantity has be delivered. This will also close the foot valves.
Physically close the API and confirm the close on the DFV-Swift screen.
10.
Select "PRNT" to complete delivery and print docket.
11.
Multi-Compartment Gravity Drop (Partial or Full)
TIP: Ensure there is appropriate space for delivered product in tank prior to and during delivery.
Connect delivery hoses to ALL APIs and connect the product-delivery elbows to be delivered from.
1.
Select "GRAV" on the DFV-Swift Home screen (refer to Figure 1.1, page 2).
2.
Wait for the DFV request and then open foot valves by pushing down of the "FOOT VALVES" button on the
3.
Swift-Mx Box.
Product is dispensed (refer to Figure 1.2, page 2 for delivery diagnostics).
4.
Physically open the first API valve to be delivered from and then product will be dispensed (refer to Figure
5.
1.2, page 2 for delivery diagnostics).
Open the remaining API outlet valves to commence delivery of other compartments.
6.
Monitor delivered quantity and select "STOP" when required to stop the flow of all product. This will also
7.
close the foot valves.
Physically close the API and confirm the close on the DFV-Swift screen. This will reopen the foot valves
8.
and flood the pipework.
NOTICE: Only the first compartment delivered from will be displayed. Other compartment's delivery details
are being recorded in the background and will be displayed once this procedure is complete.
Select "MULTI" on the DFV-Swift. (DO NOT SELECT "PRNT.")
9.
A summary of deliveries will be displayed on the DFV-Swift.
10.
Select "PRNT" to complete delivery and print dockets.
11.
P/N: DFV-SWIFT-DM, Version C
Page 4 of 10