Dahua VTO6110B 빠른 시작 매뉴얼 - 페이지 3

{카테고리_이름} Dahua VTO6110B에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dahua VTO6110B 5 페이지. Fast operation of analogue villa system

Dahua VTO6110B 빠른 시작 매뉴얼

1 System Structure

Power for VTO is DC24V/2.5A

2 Operation Steps

Wait until system connection is complete. Plug VTO to power and wait about 1 second. VTH's
power indicator turns on, and press monitor button on VTH. You will see scene in front of VTO
and this means test is complete. If there are more than one VTH, please test them one by one.
3 Install lock and unlock button
3.1 VTO5x00C
Definition of VTO5x00C ports:
Figure 3- 1
Figure 1-1
01. Port 1: to VTH 1
02. Port 2: to VTH 2
03. 3-pin 1: to lock control end 1
04. 3-pin 2: to lock control end 2
05. Power port: to input DC+24V power
06. Test port: to test device port
See Figure4-1.