Dovre Inbouwhaard 2175CBS3 조립 지침 매뉴얼 - 페이지 5

{카테고리_이름} Dovre Inbouwhaard 2175CBS3에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dovre Inbouwhaard 2175CBS3 15 페이지. Soapstone casing

Fig.10: soapstones 6 (2x) can be put into place. Put nylon plugs in soapstones 6, 8 and 9 (2x). Each
soapstone should contain 2 plugs. Now soapstones 7, 8 and 9 (2x) can be put into place; mount them
with 4.2x15 crosshead screws (8x).
Fig.11: use braces c (4x) to connect soapstone 6 (2x) to back plate 24. Put brace 21 into place and
connect it to the back plate using M6x16 bolts (flat crosshead, 2x) and nuts. Brace 21 is supported by
the device.
Fig.12: put soapstones 10(2x), 11(2x), 12(2x), 13(2x) and 14 into place. Start with the one on the
outside. Soapstones 10(2x) fit on braces c. If after putting the stones in place you see too much play
between the stones and the raised lips of sheet metal brace 21, you can put some extra pressure on
these lips so that the Stone is gripped more tightly.
Fig.13: put braces a, a' and d(2x) into place. Braces a and a' are used to connect soapstones 10(2x) and
11(2x). Now position sheet metal brace 22 onto the stones. Sheet metal brace 22 holds the soapstones
together. You can put some extra pressure on the raised lips to tighten their grip if there is too much
play between them and the stones. Brace 22 contains 2 holes which fit onto brace a and a'.
Fig14: top stones 15 and 16 can be put in place. Depending on the version (top or rear connection), a
smoke outlet opening may be provided. Floor plate 17 is installed last. Slide it in front of the device.
5
03.27680.000