Follett Horizon Elite H E1410ABT Series 설치 지침 매뉴얼 - 페이지 9
{카테고리_이름} Follett Horizon Elite H E1410ABT Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite H E1410ABT Series 16 페이지.
Chassis drain plumbing - required
§ Plug must be removed from John Guest fitting.
§ Route 3/8" drain tubing through knockout in back
of docking station and insert fully into John Guest
fitting connection at the rear of the machine chassis.
Route other end of 3/8" drain tubing to drain.
§ Drain must slope 1/4" inch per foot (6 mm per 30,4
cm).
BIN • TOP-MOUNT
Horizon 710/1010/1410
9