Follett Horizon Elite HCD1810NBS 설치 지침 매뉴얼 - 페이지 9
{카테고리_이름} Follett Horizon Elite HCD1810NBS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite HCD1810NBS 16 페이지. Ice storage bins ice machine with ride technology
Follett Horizon Elite HCD1810NBS에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (8 페이지), 매뉴얼 (8 페이지)
Connect utilities to docking assembly.
6.1
Water and drain
➊
➋
➏
silicone tubing
3/4" barb x 3/4" FPT
➍
3/4" MPT x 1" slip
➎
1" Stand pipe/Drain
• Rough-in ice machine potable water
➊
supply
. 3/8" push-in connection will be
made at included shut-off valve then at
back of docking station into solenoid.
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
pipe/drain
➎
.
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Apply Petrogel to barbed drain fitting
• Replace access panel.
BIN • RIDE Technology
➌
Minimum 8"
radius
2 ft. x 1" OD
➋
.
➌
.
➍
.
➏
self-contained
External connections
Chassis drain plumbing - required
• Plug must be removed from John Guest
fitting.
• Route 3/8" drain tubing through knockout
in back of docking station and insert fully
into John Guest fitting connection at the
rear of the machine chassis. Route other
end of 3/8" drain tubing to drain.
• Drain must slope 1/4" inch per foot (6 mm
per 30,4 cm).
6.2
Refrigerant
➊
• Braze supplied quick-connect lines onto
stub-ins
➊
.
6
9