Follett Horizon Elite HCD1810NBS Manual de instruções de instalação - Página 9
Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite HCD1810NBS. Follett Horizon Elite HCD1810NBS 16 páginas. Ice storage bins ice machine with ride technology
Também para Follett Horizon Elite HCD1810NBS: Manual de início rápido (8 páginas), Manual (8 páginas)
Connect utilities to docking assembly.
6.1
Water and drain
➊
➋
➏
silicone tubing
3/4" barb x 3/4" FPT
➍
3/4" MPT x 1" slip
➎
1" Stand pipe/Drain
• Rough-in ice machine potable water
➊
supply
. 3/8" push-in connection will be
made at included shut-off valve then at
back of docking station into solenoid.
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
pipe/drain
➎
.
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Apply Petrogel to barbed drain fitting
• Replace access panel.
BIN • RIDE Technology
➌
Minimum 8"
radius
2 ft. x 1" OD
➋
.
➌
.
➍
.
➏
self-contained
External connections
Chassis drain plumbing - required
• Plug must be removed from John Guest
fitting.
• Route 3/8" drain tubing through knockout
in back of docking station and insert fully
into John Guest fitting connection at the
rear of the machine chassis. Route other
end of 3/8" drain tubing to drain.
• Drain must slope 1/4" inch per foot (6 mm
per 30,4 cm).
6.2
Refrigerant
➊
• Braze supplied quick-connect lines onto
stub-ins
➊
.
6
9