Downee Spring Gate 설치 매뉴얼 - 페이지 8
{카테고리_이름} Downee Spring Gate에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Downee Spring Gate 14 페이지. Double gates
SOLAR PANEL
TIP
If the gate is shaded through the day, position the Solar Panel away
from the gate.
1.
Using Tek screws mount Panel Bracket to the
Solar Panel.
2.
Tek screw the Aerial on top of the Solar Panel Frame.
3.
Bolt the Solar Panel (facing north) to the Panel Post. Leave the carton
covering the Panel.
PANEL ANGLE
Setting the solar panel's angle to suit the location
will give maximum charging rate.
Tasmania
40˚
Melbourne 38˚
35˚
Sydney
Canberra
35˚
STOP LIMITS
1.
Use the Motor Key to unlock the Motor Arm.
2.
Close the gate. Bolt a Stop in place where
the Arm will sit against it when closed.
3.
Open the gate and add a Stop for the
gate's open position.
4.
Adjust as needed then tighten all bolts.
34˚
Adelaide
Perth
31˚
Brisbane
27˚
Darwin
12˚
90
Key
Stop
5