Follett Symphony REF5 설치 지침 매뉴얼 - 페이지 6

{카테고리_이름} Follett Symphony REF5에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Symphony REF5 8 페이지. Compressor retrofit kit
Follett Symphony REF5에 대해서도 마찬가지입니다: 설치 및 서비스 매뉴얼 (20 페이지)

Follett Symphony REF5 설치 지침 매뉴얼
14. Connect wiring to new
compressor, be sure to
connect ground wire to the
body of compressor.
15. Using a nitrogen purge, braze
all joints.
16. Leak check and evaccuate to
at least 500 microns for 30
minutes.
17. Charge unit with R404A
refrigerant (7.9 oz on REF 4/5
and 10 oz on REF 5BB)
18. The replacement compressor
is taller and will not allow the
drain pan to be installed in the
original position (on REF4/5
models).
§ Adhere the supplied Velcro tape
to the bottom of the drain pan
(Fig. 11).
19. Reinsulate suction line with
supplied insulation and wire
tie in place using supplied wire
ties.
6
REF4/5 and REF5BB Compressor Retrofit
Fig. 10
Fig. 11
Fig. 12