AMQ Activ Pro 2.0 조립 설명서 - 페이지 18
{카테고리_이름} AMQ Activ Pro 2.0에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AMQ Activ Pro 2.0 20 페이지.

Phase 10 | Replacing Glides with Castors (Optional)
Step 3
Use a number 17 open wrench(not provided by
AMQ) to secure the castors.
Activ Pro 2.0 Assembly Guide | 18
Step 4
When the castor installation is complete, the
castor needs to be locked. It need 2 people
to operate it at the same time to turn the
desk to its upright position.
4
Locking Caster
3
Number 17
open wrench
Not provided
by AMQ
amqsolutions.com