AMQ Activ Pro 2.0 조립 설명서 - 페이지 19
{카테고리_이름} AMQ Activ Pro 2.0에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AMQ Activ Pro 2.0 20 페이지.

Phase 11 | Program Height Memory Presets
Step 1
To Program Up to 4 Presets: Use the up/down
arrows to find desired height, then press "M"
followed by the number 1, 2, 3 or 4.
Activ Pro 2.0 Assembly Guide | 19
Step 2
To Test Programmed Height: Use the up/down
arrows to adjust the table to a height other than
the preset height. Then push the number you
programmed to see if it automatically adjusts to
the height programmed in Step 1. You may need
to hold for 2-3 seconds to activate the base.
Note: If it does not adjust to the programmed
height, repeat Step 1 followed by Step 2.
amqsolutions.com