Draper SLX17 설치 및 운영 지침 매뉴얼 - 페이지 4

{카테고리_이름} Draper SLX17에 대한 설치 및 운영 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Draper SLX17 7 페이지. 230v ac scissor lift slx video projector lift
Draper SLX17에 대해서도 마찬가지입니다: 브로셔 및 사양 (16 페이지), 설치 및 운영 매뉴얼 (7 페이지), 설치 및 운영 지침 매뉴얼 (7 페이지), 설치 및 작동 지침 (8 페이지)

Draper SLX17 설치 및 운영 지침 매뉴얼
230V AC Scissor Lift SLX by Draper
Connecting Controls to Data Cable Splitter Board
Controls plug into the Data Cable Splitter Board, which is located on
the Top Frame on the front side of the lift, using RJ14 connectors.
For IR or RF Remote Control, use data cable with RJ14 connectors
on both ends.
For serial control of "Show" position, use data cable with RJ14
connectors on both ends and an R2D7 Serial Control Interface.
Plug into the "RP/RQ" input.
Any control, including automated dry contact systems, being
connected to the wall switch input MUST send a momentary signal.
Please Note:
Data cable connections must be made using
electrically straight 4-conductor modular cable
(RJ14). If making your own cables, this means
colors do not cross over: blue leads to blue, green
to green, etc. (see diagram below).
Pin
Pin
1 2 3 4 5 6
1 2 3 4 5 6
Y G R B
Y G R B
CLEARING THE SHOW POSITION AT CURRENT SHOW POSITION:
1 Move lift to the show position.
2 While lift is at the show position press and hold the Key Up toggle
switch and release once the Lift begins moving upward.
3 The show position is now cleared and ready for a new show position
to be set.
CLEARING THE SHOW POSITION AT THE MAINTENANCE POSITION:
1 Move lift to the maintenance position.
2 While lift is at the maintenance position press and hold the Key Down
toggle switch and release once the Lift begins moving upward.
3 The show position is now cleared and ready for a new show position
to be set.
PLEASE NOTE: At this point the Key Switch will not operate until
the new "Show Position" has been set. Also the 3-Button Wall Switch
changes into a maintain, push and hold type button, for continuous
movement. This allows for easy setting of new "Show Position")
PROCEDURE FOR SETTING SHOW POSITION:
1 Now that the show position has been cleared, use wall switch up and down
buttons to get lift into desired show position.
2 While lift is at desired show position, press and hold the Key Down toggle
switch until lift begins to move upward. Lift will begin a calibration cycle
where it will move upward for two seconds, stop then move down for one
second and then the Lift will return to the desired show position.
Red - Down
Green
Black - Com
Black
Black - Com
Blue - Up
Yellow
Low voltage
wiring by others
SP-KSM
1 When the Optional Delay Feature is installed the Delay Switch must be in
2 If the Optional Delay Feature is installed and the "Show Position" requires
switch. Always be prepared to shut lift off manually when new adjustment is
being tested. Please refer to wiring diagram.
PLEASE NOTE:
Changing the fully open or fully closed position will reset the
electronic controls and cuase the lift to operate improperly.
Please call Draper before attempting these adjustments.
www.draperinc.com
DETAIL OF DATA CABLE
SPLITTER BOARD
Pin
1 2 3 4 5 6
Y G R B
Pin
1 2 3 4 5 6
Y G R B
Pin
6 5 4 3 2 1
B R G Y
Optional Delay Feature
the "Delay On" position for normal operation.
adjusting, then the "Delay Switch" must be switched to Off while adjusting
the show position.
PLEASE NOTE: If the Scissor Lift loses power, the DOWn
function will not work until you operate the lift in the uP
direction using the wall switch. This allows the lift's control
encoder to recognize it's "home" location.
CAUTION: Be sure all switches are in Off position before adjusting limit
Adjusting Limit Switches
(765) 987-7999
page 4 of 7
Function Indicator
Low Voltage Trigger
(6-24 VDC)
(No +/- wiring requirement)
RP/RQ Bus Ports for
remote controls such as
IR Eye, RF Receiver, LED
Wall Switch and RS232
LVC-S
DCU
Green
Black
Yellow
R2D7 (Optional)
To RS232 Port:
Yellow = Rx (Data from control system)
Green = Tx (Data to control system)
Red = Unused
Black = Gnd (Signal Ground)
Pin
1 2 3 4 5 6
Y G R B